Completed installations, repairs and off-grid builds across remote and rural sites — estates, farms, workshops and properties off the mains. Each one started as a power problem; here's what was done and how it turned out.

A Portable Off-Grid Power Cabinet
Off-Grid · Custom Build

A Portable Off-Grid Power Cabinet

Exposed cabin near Thurso, Caithness. The site had no mains and needed power that could survive the far north and be moved if the setup changed. We built solar, wind and generator input into one sealed, relocatable steel cabinet with 5kWh of storage and remote monitoring — a complete off-grid supply that looks after itself between visits.

Read the full case study
Keeping a Classic Lister Running
Servicing

Keeping a Classic Lister Running

Remote estate, north Scotland. Decades-old Lister plant with an obsolete Startomatic auto-start, no parts catalogue and nobody to escalate to — but the estate's backup power depended on it. We hold it on a yearly servicing schedule and give it the same rigour a new install would get, so it stays dependable rather than becoming a liability.

Read the full case study
Bringing a 30kVA Generator Back to Life
Repair & Modernisation

Bringing a 30kVA Generator Back to Life

Off-grid yard. The site's only power source arrived non-operational, and replacement would have been the easy sell. Instead we repaired and fully serviced the 30kVA set, modernised the controls with remote start and monitoring, and fitted a new distribution board — bringing a written-off machine back as dependable sole-source power at a fraction of replacement cost.

Read the full case study
Budget-Conscious Backup Power
Generator Installation

Budget-Conscious Backup Power

Domestic property, Banffshire. The owner wanted reliable backup for the essentials — lights, heating, freezers — on a real budget, not the biggest set on the market. We sized an 8kVA long-run diesel to exactly that and fitted an automatic transfer switch, so it starts itself when the mains drops and needs nobody standing over it.

Read the full case study
Where There's No Three-Phase Supply
Commercial · Three-Phase

Where There's No Three-Phase Supply

Joinery workshop. A workshop full of three-phase machinery and no three-phase supply to run any of it. We sized, installed and commissioned a 23kVA three-phase generator to become the primary supply, with changeover wired in so it doubles as whole-property standby — turning an unusable building into a working one.

Read the full case study

Every project here is a real site with real constraints — a workshop with no three-phase supply, a generator that arrived dead, an estate depending on decades-old plant, a cabin with no mains at all. The common thread is honest sizing, proper certification and equipment chosen for the job rather than the invoice. If your situation looks like one of these, it's worth a conversation.

Let's talk about your project.

No obligation — tell us about your site and we'll be straight with you about what makes sense.

Get in Touch Prefer to talk it through? Call +44 7356 289964
Call Now Get in Touch